Recent Case Studies
Industrial Gas Plant in Ireland Reverses Critical Compressor Varnish in 24 Hours with DECON™
An Irish industrial gas plant slashed MPC™ from 57 to 7.7 — an 86% drop in 24 hours — using DECON™, with zero downtime and an estimated €258,500 in savings.
North Sea Platform Operator Extends Turbine Oil Life and Secures Fleet-Wide Approval with DECON™
North Sea operator extends SOLAR gas turbine oil life in-service with DECON™ — MPC stabilised at 5, no oil change, $4M saved, 194x ROI.
Egyptian Fertilizer Plant Eliminates Turbine Trips with DECON™
An Egyptian fertilizer plant cut MPC from 30.3 to 9.4 and eliminated varnish-related steam turbine trips with DECON™ — no shutdown required, for a 13:1 return.